• 24/7 emergency call-outs
  • NICEIC Approved Contractor
  • 30 years in business
  • No call-out charge
  • Free, no-obligation quotes
  • Same day response across Stoke-on-Trent
  • All work tested and certified
Consumer unit checked during EICR testing in Alsager

EICR Testing in Alsager

Our EICR testing in Alsager gives homeowners a clear report on the condition of their electrics, often before bigger work such as an extension or rewire. We cover Alsager from Talke.

  • NICEIC Approved Contractor
  • 30 years in business
  • Free, no-obligation quotes
  • No call-out charge
NICEIC Approved Contractor logo

Planning EICR testing in Alsager

  1. 01

    Before an extension or new kitchen

    If you are planning building work in Alsager, an EICR tells you whether the existing wiring and consumer unit can take new circuits. Finding out early lets you budget for any upgrades and avoids surprises once the builders are on site.

  2. 02

    Limits agreed before testing

    Some parts of an installation cannot be fully tested without lifting floors or moving fitted furniture. We agree any limits with you before we start, and they are written on the report, so you know exactly what was and was not covered.

  3. 03

    Reading your report

    The report lists observations, each with a code and a short explanation. The summary tells you whether the installation is satisfactory overall. We go through it with you, so you understand which items need fixing now and which are worth planning for later.

Booking EICR testing in Alsager

We cover Alsager from our base in Talke. When you book, tell us about any building work you are planning and when it is due to start, so we can test early enough to help with your plans.

On the day, we inspect the installation, test the circuits and note any limits. Once the report is ready, we talk you through it and quote for any work needed, either on its own or as part of the wider project.

Worth mentioning when you book

  • Building work you are planning
  • When the project starts
  • Areas that are hard to reach
  • Any circuits that trip often
  • Previous reports or certificates

How it works

  1. Call or send a message

    Tell us what you need or what has gone wrong. We aim to respond the same day across Stoke-on-Trent.

  2. We visit and quote

    We look at the job, explain what needs doing and give you a free quote before any work starts.

  3. Work tested and certified

    We finish the job, test everything we have worked on and hand over the certificate for your records.

EICR testing in Alsager: your questions

Should I get an EICR before an extension in Alsager?

It is a good idea. An EICR shows whether your wiring and consumer unit can take the new circuits an extension needs. If an upgrade is needed, you can plan it into the project from the start, rather than finding out when the electrician arrives for first fix.

Can you test all of my wiring in Alsager without lifting floors?

Most of it, yes. Testing is done mainly at sockets, switches, fittings and the consumer unit. Some cable runs cannot be seen without lifting floors. We agree any limits before we start and record them on the report, so the coverage is clear.

Can you explain my EICR results to me in Alsager?

Yes. Once the report is ready, we go through it with you, explaining what each observation means, how urgent it is and what it would take to fix. You then decide what to do and when, with a clear quote for any work you want carried out.

Can the remedial work be done during my Alsager renovation?

Often, yes. If you are already having building work done, it can make sense to fix EICR items at the same time, when walls and floors are open. We can include the remedial work in the electrical quote for your project, so it is all done together.

EICR testing near Alsager

We also offer EICR testing in these towns near Alsager.