
Our EICR testing in Alsager gives homeowners a clear report on the condition of their electrics, often before bigger work such as an extension or rewire. We cover Alsager from Talke.

If you are planning building work in Alsager, an EICR tells you whether the existing wiring and consumer unit can take new circuits. Finding out early lets you budget for any upgrades and avoids surprises once the builders are on site.
Some parts of an installation cannot be fully tested without lifting floors or moving fitted furniture. We agree any limits with you before we start, and they are written on the report, so you know exactly what was and was not covered.
The report lists observations, each with a code and a short explanation. The summary tells you whether the installation is satisfactory overall. We go through it with you, so you understand which items need fixing now and which are worth planning for later.
We cover Alsager from our base in Talke. When you book, tell us about any building work you are planning and when it is due to start, so we can test early enough to help with your plans.
On the day, we inspect the installation, test the circuits and note any limits. Once the report is ready, we talk you through it and quote for any work needed, either on its own or as part of the wider project.
Tell us what you need or what has gone wrong. We aim to respond the same day across Stoke-on-Trent.
We look at the job, explain what needs doing and give you a free quote before any work starts.
We finish the job, test everything we have worked on and hand over the certificate for your records.
It is a good idea. An EICR shows whether your wiring and consumer unit can take the new circuits an extension needs. If an upgrade is needed, you can plan it into the project from the start, rather than finding out when the electrician arrives for first fix.
Most of it, yes. Testing is done mainly at sockets, switches, fittings and the consumer unit. Some cable runs cannot be seen without lifting floors. We agree any limits before we start and record them on the report, so the coverage is clear.
Yes. Once the report is ready, we go through it with you, explaining what each observation means, how urgent it is and what it would take to fix. You then decide what to do and when, with a clear quote for any work you want carried out.
Often, yes. If you are already having building work done, it can make sense to fix EICR items at the same time, when walls and floors are open. We can include the remedial work in the electrical quote for your project, so it is all done together.
We also offer EICR testing in these towns near Alsager.
Planning work on your Alsager home? Ring us to arrange an EICR before the project starts.