
Our EV charger installation service in Audley fits smart chargers for homes with one or two electric cars. Audley is a short trip from our base in Talke, and quotes are free.

If your household has two electric cars, you can fit two chargers or one charger with two outlets. Load management shares the available power between them, so they do not overload your main fuse. We look at your supply and how you use the cars before recommending a setup.
If the house wall is too far from where you park, the charger can go on a post at the edge of the drive. That needs an armoured cable laid underground from the house. We plan the trench route to avoid pipes, paving you want to keep and existing cables.
If your new electric car is due in a few weeks, it is worth booking the survey now. Some installations need approval from the network operator first, and getting that sorted early means the charger is ready on the day your car is delivered.
We come out to Audley from Talke, only a few minutes away. We start with a survey of your supply, earthing and parking, then talk through whether one or two chargers, or a post-mounted unit, suits you best. You receive a free quote with everything included.
We fit the charger and circuit, test the installation and run a charge if a car is available. Once the app is set up and the network operator has been notified, you receive the certificate for your records.
Tell us what you need or what has gone wrong. We aim to respond the same day across Stoke-on-Trent.
We look at the job, explain what needs doing and give you a free quote before any work starts.
We finish the job, test everything we have worked on and hand over the certificate for your records.
Yes. You can have two chargers or a single unit with two outlets, and load management shares the power between them. We check your main fuse and supply during the survey and recommend a setup that lets both cars charge without overloading the house.
Yes. If the house wall is too far from where you park, we can mount the charger on a post and run an armoured cable underground to it. We plan the trench route with you at the survey, and the groundwork is included in your quote.
A few weeks ahead is sensible. Most installations only need notifying to the network operator after fitting, but some need approval first, which can take longer. Booking the survey early means everything is in place by the time your car is delivered.
Someone needs to be there to let us in, as the power is off while we connect the new circuit. It also helps to have the car at home at the end, so we can test a full charge and set up the app with you before we leave.
We also install EV chargers in these places close to Audley.
Tell us how many electric cars you have and where you park, and we'll arrange a free survey in Audley.